Renovation of gym in Hilton Nicosia

05/11/2010

During the November 2010 IDS had an opportunity to renovate floor in Hilton Nicosia gym.
The process begin by removing of 10 years old floor covering and grinding out old adhesives. Self leveling compound NC 170 from UZIN has been lay down in order to provide perfect smooth subfloor. But first primer PE 370 from UZIN was applied in order to provide perfect bond surface and moisture barrier. After all this necessary steps, the new floor covering from BSW, as you can see in gallery below, was installed using adhesive KE 2000S from UZIN by our skilled technicians. The result is perfect professional and durable floor which is resistance to heavy impact and easy to maintain.

Gallery